From the top, the view takes in Dubai Marina, Palm Jumeirah, Burj Al Arab and Burj Khalifa. Hydraulic motors turn the wheel by way of 64 rubber-tyred friction rollers placed at either end of the boarding platform, and at night LED displays light up the whole structure.

The wheel was announced in February 2013 under the name Dubai Eye. Hyundai Engineering & Construction and Starneth Engineering were the main design and construction contractors, working with the engineers KCI, and building started in May 2015. After repeated delays it took its first passengers on 21 October 2021. It closed in March 2022 for what its operators called periodic enhancements, stayed shut through 2023 while its axle sat in scaffolding, and reopened to visitors on 26 December 2024. Ain Dubai has its own lounge and restaurant serving lunch, dinner and drinks, and some cabins are set up as private spaces with food and drink.